Data Centre Builders UK

Constructing a data centre is not just like building an ordinary building. This involves establishing a technical environment that operates continuously. All details, such as power infrastructure and cooling systems, need to be planned out and delivered with precision, including access for the team to the facility. At New Build Contractors, we design and build data centres for operators who need reliability, resilience and scalability from the start. We know how stressful each project can be, whether you are an owner, developer or end-user. Your facility must run harder, faster, and more efficiently than ever before, with more data, AI, cloud usage, and connected services. Our job is to make sure it does.

Data Centre Construction

Our Specialist Approach

Data centre construction requires coordination across all disciplines. Our team includes structural, civil, MEP, ICT, and commissioning specialists from the start. We treat your project as a critical asset that must be designed, engineered, delivered, and tested to precise standards.

Here’s how we work:

Early Involvement

We start with feasibility and utility assessments, power availability, cooling requirements, and any local constraints. Early clarity prevents late-stage surprises.

Integrated Design

Our designers coordinate with your consultants, IT teams, and security leads to ensure the building and technical systems are aligned.

Specialist Project Delivery

We work with partners for UPS, switchgear, mechanical plant, BMS, ICT cabling, and containment systems to ensure everything integrates onsite.

Clear Communication

We keep you informed about project stages, upcoming steps, and required decisions. We use clear language and avoid assumptions.

Quality & Safety as Standard

Each installation is subject to strict QA/QC and safety checks. We do not accept work that does not meet the required standards.

data_centre-construction1.jpg

What we Build

Power and Redundancy

Every data centre needs reliable power. We design and install systems that keep your operations going, even when conditions are challenging.

  • Uninterrupted Power Supplies (UPS)

  • Standby diesel/gas generators

  • Redundant power paths (N+1, N+N, 2N setups)

  • Switchgear, transformers and LV/HV distribution

  • Integrated testing and commissioning for all power systems

Why it matters:
With this setup, you avoid costly downtime and keep your business running, no matter what is happening around you.

data-centre-builders-construction2.jpg

Cooling and Termal Management

Data centres produce a lot of heat, so controlling it is key to running things smoothly and keeping costs down.

We deliver:

  • Precision cooling systems

  • Free cooling and adiabatic solutions

  • Hot aisle / cold aisle containment

  • CRAC / CRAH units

  • Energy-efficient chillers and in-row cooling

  • High-density rack cooling for intensive workloads

Why it matters:
With better cooling, you get a lower PUE, save on running costs, and keep your equipment in a more reliable environment.

data-centre-construction3.jpg

Fire Protection and Life Safety Systems

It is essential to protect both your equipment and the people who work in your facility.

We install:

  • Early-warning detection systems

  • Gas suppression systems

  • Zoned fire compartmentation

  • Emergency lighting and alarms

  • BMS-integrated monitoring

Why it matters:
A minor incident should never become a significant loss. Our systems are designed to isolate and resolve issues quickly and safely.

data-centre-builders-construction3.jpg

Security and Access Control

Your data centre is valuable and faces significant risks. We combine physical and technical security to protect it.
  • Access control with zoned permissions
  • Perimeter security
  • CCTV with monitoring
  • Man-trap and dual-authorisation access (if required)
  • Secure loading and delivery areas
Why it matters:
Security keeps your operations, clients, and reputation safe, even before the first server is running.
data-centre-construction2.jpg

Scalable and Modular Construction

The need for data is growing faster than ever. It's essential to have a facility that can keep up with your business as it expands.

We deliver:

  • Modular data halls

  • Expansion-ready cooling and power

  • Quick-connect mechanical systems

  • Infrastructure designed for future loads

 

Why it matters:
This helps you avoid costly downtime and keeps your future upgrade costs much lower.

data-centre-builders-construction1.jpg

Our Process: What Working With Us Feels Like

We keep things simple. Here is what you can expect when you work with us.

1. Feasibility & Early Planning

We review your needs, the site, and available utilities. We also assess planning risks, access issues, schedule constraints, and early MEP needs.

2. Detailed Design & Coordination

We work with your team and ours to ensure all systems are coordinated before on-site work begins.

3. Construction & Fit-Out

We manage structural works. We handle the structure, building envelope, fit-out, mechanical systems, power, and technical installs. We test and sign off on each part as we finish it.

4. Testing and Commissioning 

We run all tests, from Factory Acceptance to complete system checks, to make sure everything works before handover.

5. Handover, Training & Operational Support

We provide clear documents, train your team, and make sure the handover goes smoothly. We can support you after the handover if needed.

FAQ

Do I need to have full designs before approaching you?

-

Not at all. Many clients come to us at the feasibility stage to ensure the project is shaped correctly from the start.

How long does a data centre take to build?

-

It depends on size, power demand and whether modular methods are used. Smaller facilities can be delivered in under a year, while larger campuses typically require phased programmes.

Do you work with hyperscale, enterprise and co-location operators?

-

Yes—we tailor our delivery model to the operator type and their technical requirements.

Let’s get
started

Would you like to learn more about how we can help you with your next residential or commercial project, fill in your details and a member of our team will be in touch.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Latest From the Blog

kitchen-extension-london12.jpg
Is Buying a New Build Home a Good Investment?

Buying a home is one of the most significant financial and emotional decisions you’ll ever make — and with so many new developments across London and the South East, it’s only natural to wonder:Are new-build homes really a good investment? At New Build Contractors, we’ve bui..

Read Full Story »
kitchen-extension-london1.jpeg
Hidden Costs to Watch Out For During Construction

Building a new home or a significant extension is exciting, but even with the best planning, hidden costs can pop up when you least expect them. At New Build Contractors, we’ve seen firsthand how small details can become expensive surprises if not addressed early. Here’s what to look out for, and how ..

Read Full Story »